Optical Alignment & Validation Testing for Class 3B Laser System

Project Description

We require an Orlando or US contract laboratory to perform optical alignment and validation of a build‑to‑print 520 nm continuous Class 3B laser system (<50 W). Scope includes:

  • transport to a verified Class 3B TCA
  • mechanical integrity check
  • optical alignment
  • full validation (system bring‑up and thermal soak) with detailed results.

Safety compliance per ANSI Z136.1, certified laser eyewear, controlled area signage, and access ­control required. Phase 2 makerspace facility scheduling indicated Nov 4‑5, 2025.

Safety Requirements

-This work uses a Class 3B laser system and must follow ANSI Z136.1 operational safety. We are focused on safe operation, not product certification.

* A temporary controlled area in your workshop: 5 m (16 ft) unobstructed line, access control during operation, posted Class 3B signage
Please confirm you have, or can immediately procure:

Safety and tooling equipment I bought
* A calibrated digital torque wrench (N·m), calibration date within the last 12 months
* Certified laser safety eyewear rated OD ≥ 6 at 520 nm (regular safety glasses are not sufficient)
-Safety sign

Only thing left is the beam dump but given I’m very new I’m wondering if you can supply them if not I can source one.

-If FCG‐01 is not approved by November 6, 2025, the Client
may terminate this agreement for convenience with no liability beyond the
reimbursement for pre-approved safety items.

Requirements of Phase of Project with Laser

3.2 Phase 2 (Makerspace TCA): Optical Alignment and Validation shall occur exclusively
within the verified Class 3B TCA at the Makerspace facility or lab

Milestone 3: Phase 2 Alignment & Validation (Makerspace TCA)
○ Securely transport the assembly to the Makerspace TCA. Re-verify mechanical
integrity.
○ Perform optical alignment procedures (C.10 Section 4.4). , this will be given to me by the client
○ Execute the full validation and testing plan (C.10 Section 6), including system
bring-up and thermal soak, meticulously recording all results.

Project Details

Target Completion DateNovember 4, 2025

Length of ServiceOne-time Service

Number of Samples1

Product Type

  • Electronics & Electrical Equipment

Testing Type

  • Electrical Testing
  • Mechanical & Structural Testing
  • Optical Testing
  • Performance Testing
Status:Open

Can you help?

Respond to this Request

roncidesigns11

Sign In

Register

Reset Password

Please enter your username or email address, you will receive a link to create a new password via email.