Laboratory Test Request

Main Gas Pipeline Residual Life Testing

Project Description

Contract laboratory needed to develop an integrated approach to predict the residual life of a main gas pipeline.

Original:
Разработка комплексного подхода при прогнозировании остаточного ресурса магистрального газопровода.

Project Information

Number:24-01877

Industry:Oil and Petroleum

This request is open and accepting quotes! Register or Log In to unlock more information or respond to this request.
 Compressed Gas,
				Industrial Gases,
				Liquid Gas (LG),
				Natural Gas,
				Oil and Petroleum,
				Pipelines,

Test Request: 24-01875

MULTIPLE SAMPLES UK Third-party oil and petroleum laboratory needed to analyze used 2X engine oil samples following tes... view


Test Request: 24-01855

MULTIPLE TESTING LONG TERM EUROPE / LITHUANIA third-party laboratory needed for testing paraffin mixtures for followin... view


Test Request: 24-01673

Third-party laboratory (Qatar preferred) needed to conduct testing of oil well cement as per API 10A standard (Cements a... view